What's included

  • Floor check. We look for hollow, cracked or uneven tiles that need fixing before an overlay.
  • Surface preparation. Levelling where needed, so the new floor sits flat.
  • Vinyl installation. SPC or LVT laid over existing tiles or a prepared floor.
  • New tiles, if you prefer. Hacking and re-tiling for areas where vinyl isn't the right choice.
  • Skirting. New skirting to cover the edge and give a clean finish.
  • Transitions and door trims. Neat edges where the vinyl meets other floors, and door trimming where the floor height changes.

SPC or LVT: what's the difference?

Both are vinyl flooring, and both come in wood-look and stone-look designs.

  • SPC (stone plastic composite) has a rigid core. It's stiff and stable, usually clicks together without glue, and handles small unevenness in the floor below well.
  • LVT (luxury vinyl tile) is more flexible. It can be glued down or click-fitted, and is often thinner, which helps where door clearance is tight.

The right choice depends on your existing floor, door heights and how you use the room. We bring samples and explain the options during the site visit. Products and thicknesses: [DEMO].

Vinyl overlay on existing HDB tiles

Laying vinyl over existing tiles is common in both BTO and resale flats. It avoids hacking, so the job is quieter and shorter, and there's less debris to remove. For it to work:

  • The existing tiles must be firmly bonded. Hollow or loose tiles are fixed first.
  • The floor must be reasonably level, or levelled.
  • Doors may need trimming because the floor gets slightly higher.

Vinyl suits living rooms and bedrooms. For bathrooms and other wet areas we recommend tiles with proper waterproofing instead (see kitchen & bathroom renovation).

How the flooring job works

  1. Photos or site visit. We check the floor condition and measure the area.
  2. Samples and itemised quote. You choose the type, colour and skirting; the quote lists each area.
  3. Permit check. Laying vinyl doesn't need an HDB permit, but replacing tiles does. We tell you which applies and apply for the permit where needed.
  4. Preparation. Furniture moved or protected, hollow tiles fixed, floor levelled.
  5. Installation. Vinyl, skirting and trims.
  6. Handover. We walk the floor with you and clean up.

How long does vinyl flooring take?

Vinyl overlay is usually one of the quicker renovation works, because there's no hacking. The time depends on the floor area, how much preparation the floor needs, and whether furniture is in the way. We give you a schedule with the quote.

What affects the cost

  • Floor area and number of rooms
  • SPC or LVT, and the product chosen
  • Floor preparation and repairs to hollow tiles
  • Skirting type and length
  • Door trimming
  • Whether furniture needs moving

Vinyl flooring questions

Is vinyl flooring waterproof?

Most SPC and LVT products resist water on the surface, which is why they suit living areas. Standing water at the edges or joints is still a problem, so we don't recommend vinyl for bathrooms.

Can you lay vinyl in a flat we're living in?

Yes, often room by room. We plan the order with you so you always have somewhere to stay.

Do I need to remove my skirting?

Usually the old skirting is removed or covered and replaced with new skirting. We'll confirm on site.

Sample flooring projects

Thinking about new floors?

Send us photos of your current floor and the rooms you want done. Your enquiry comes straight to us, and we'll bring samples to the site visit.

WhatsApp us